TIMBERBANK SITE CONFIGURATOR & BATTERY METER

Size an open-atmospheric (0 psig) 45-mil EPDM hydronic thermal battery fed by TimberKiln 25 (70–90 kWhth/batch) to heat a 4-season greenhouse across real climates, soils, and water tables.

STAGE 1 R&D · REV 1 STRAWMAN · 23/23 CAD VALIDATED
Recommended Topology GWTES Gravel-Water 3.00 × 2.20 × 1.00 m · 6.6 m³
Usable Thermal Bank 240 kWh_th 3× TimberKiln batches (25→70 °C)
Winter Autonomy 7.2 d avg / 4.0 d snap 1 kiln run every 2.4 d in Jan
Est. Stage 1 Materials $5,792 CAD Storage Core $11.96/kWh · All-in $24.13/kWh

Site, Climate & Bank Workbench

ADAPTS GEOMETRY, INSULATION STACK, HYDRONICS & BOM IN REAL TIME

1. Climate & Design Temps °C / meters

2. Greenhouse Envelope feet / glazing

3. Crop & Root-Zone Target dual-stage

4. Ground & Site Conditions auto-topology

5. TimberKiln 25 Bank Size 80 kWh / batch

Mode 1 · In-Ground GWTES (Pea-Gravel) — Cross-Section Cutaway 0 psig Open-Atmospheric · 45-mil EPDM · 240 kWh_th
GEOTECHNICAL & HYDRAULIC CHECK: PASS Well-drained soil & deep water table: Auto-selected Mode 1 In-Ground GWTES.

Bank Geometry & Hydraulics

Greenhouse Load & Burn Cadence

TimberVolt Energy Triangle

Thermal Storage Medium Comparison

SCALED TO YOUR CONFIGURED CAPACITY · 25 kWth HYDRONIC INPUT
Storage Medium Temp Window Core Vol. Heat Transfer / Hardware Core Est. Field Trade-Offs w/ TimberKiln 25

ESP32-S3 Thermocline Battery Meter & Greenhouse Controller

SERVED DIRECTLY FROM WAVESHARE ESP32-S3 DIN FLASH · OFFLINE-FIRST

HOUR 18 · TIMBERKILN 25 CHARGING SIMULATED BENCH STATE (DEMO ONLY)

8-Depth Thermocline Lance

Removable 304SS dry thermowell (T1 Top → T8 Bot)

25 °C Cutoff 62 °C Full Trip 75 °C Max
Usable State of Charge 78% · 187 kWh Air-grade (>38 °C): 112 kWh_th
Estimated Autonomy 5.6 days Cold-snap floor: 3.1 d
Next TimberKiln Run IN 5.4 DAYS Incl. 5.5 h kiln burn lead time
Net Thermal Power +21.5 kW Charging from TimberKiln 25
8-Cell Thermal Charge Gauge
Canopy Air / RH 10.6 °C / 72% RH
Stage 1 Root Zone 18.3 °C (Mix 42%)
Stage 2 Air & Vents Fan 18% · Vent 0%
Botrytis VPD Guard VPD 0.36 kPa (OK)
READY FOR FULL TIMBERKILN 25 RUN HARD LIMIT: 85 °C MECH AQUASTAT · ROOT CAP ≤ 38 °C

Estimated Stage 1 Canadian Material BOM & Safety Interlocks

SCALES WITH YOUR TIMBERBANK CONFIGURATION · EXCL. TAX & EXCAVATION

Component / Subsystem Group Configured Quantity & Spec Est. CAD
Stage 1 R&D material outlay estimate based on domestic Canadian supply benchmarks (CAD, before GST/PST and site excavation labor). Not commercial retail pricing, ordering, or UL/CSA certification.